November 19, 2020No Comments

Fuel Winterization Procedures

Pilot Flying J 2020 – 2021 Winterization Procedures


Winterization Procedures for Travel Center locations except in Illinois and Iowa:

Pilot Flying J will begin blending a single treatment of cold flow improvers when the outside temperature reaches +15F to +5F.  Should the outside temperature reach +5F to -5F, we will begin double treatments of cold flow improvers. 

If the outside temperature dips below -5F, the fuel will be treated with double treatments of cold flow improver and 20% of No. 1 fuel.  Should No. 1 fuel not be available in the market area, triple treatment of cold flow improver will be used. 

All stores, except the cold weather locations listed below, will receive treatment as needed.

Cold weather locations will begin treatment once the outside temperature reaches +15F and will continue treatment until March 1, 2021 regardless of the outside air temperature.   

COLD WEATHER LOCATIONS:

Includes all stores located in the following states:

ColoradoNew York
MassachusettsNorth Dakota
MichiganSouth Dakota
MinnesotaWisconsin
NebraskaWyoming

Also includes the following locations:

StoreCityStateStoreCityState
29FremontIN88310PlymouthIN
31HighlandIN86748Michigan CityIN
35South BendIN88305HammondIN
36ValparaisoIN88316DyerIN
198PlymouthIN896BowNH
719GaryIN2AustinburgOH
445Burns HarborIN694AustinburgOH
448LowellIN4AvonOH
650Lake StationIN87236AvonOH
1020Lake StationIN12PerrysburgOH
653HebronIN15ToledoOH
81426HobartIN303NapoleonOH
83991GaryIN700Lake TownshipOH
86662BristolIN86395WatervilleOH
86664BristolIN83328Newburgh HeightsOH
86666GoshenIN88133BereaOH
88080AngolaIN311EriePA

Procedures for Travel Center locations in Iowa and Illinois:
Once treatment begins at any Illinois or Iowa location, double treatment rates will continue until March 1, 2021 regardless of the outside air temperature while biodiesel is being blended.

Product Supply:
Lubrizol and Tellico brand will be Pilot Flying J’s primary winter diesel additive providers for the 2020-2021 winter season.

Comments

No comments.

Leave a reply

© 2018 Logiflex Inc

November 19, 2020No Comments

Fuel Winterization Procedures

Pilot Flying J 2020 – 2021 Winterization Procedures Winterization Procedures for Travel Center locations except in Illinois and Iowa: Pilot Flying J will begin blending a single treatment of cold flow improvers when the outside temperature reaches +15F to +5F.  Should the outside temperature reach +5F to -5F, we will begin double treatments of cold…

Written by Tihomir Yordanov

Winter-fuel

Pilot Flying J 2020 – 2021 Winterization Procedures

Winterization Procedures for Travel Center locations except in Illinois and Iowa:

Pilot Flying J will begin blending a single treatment of cold flow improvers when the outside temperature reaches +15F to +5F.  Should the outside temperature reach +5F to -5F, we will begin double treatments of cold flow improvers. 

If the outside temperature dips below -5F, the fuel will be treated with double treatments of cold flow improver and 20% of No. 1 fuel.  Should No. 1 fuel not be available in the market area, triple treatment of cold flow improver will be used. 

All stores, except the cold weather locations listed below, will receive treatment as needed.

Cold weather locations will begin treatment once the outside temperature reaches +15F and will continue treatment until March 1, 2021 regardless of the outside air temperature.   

COLD WEATHER LOCATIONS:

Includes all stores located in the following states:

Colorado New York
Massachusetts North Dakota
Michigan South Dakota
Minnesota Wisconsin
Nebraska Wyoming

Also includes the following locations:

Store City State Store City State
29 Fremont IN 88310 Plymouth IN
31 Highland IN 86748 Michigan City IN
35 South Bend IN 88305 Hammond IN
36 Valparaiso IN 88316 Dyer IN
198 Plymouth IN 896 Bow NH
719 Gary IN 2 Austinburg OH
445 Burns Harbor IN 694 Austinburg OH
448 Lowell IN 4 Avon OH
650 Lake Station IN 87236 Avon OH
1020 Lake Station IN 12 Perrysburg OH
653 Hebron IN 15 Toledo OH
81426 Hobart IN 303 Napoleon OH
83991 Gary IN 700 Lake Township OH
86662 Bristol IN 86395 Waterville OH
86664 Bristol IN 83328 Newburgh Heights OH
86666 Goshen IN 88133 Berea OH
88080 Angola IN 311 Erie PA

Procedures for Travel Center locations in Iowa and Illinois:
Once treatment begins at any Illinois or Iowa location, double treatment rates will continue until March 1, 2021 regardless of the outside air temperature while biodiesel is being blended.

Product Supply:
Lubrizol and Tellico brand will be Pilot Flying J’s primary winter diesel additive providers for the 2020-2021 winter season.

Subscribe to our blog and never miss a post.

For more information, check out our Privacy Policy.

Leave a Reply

Your email address will not be published. Required fields are marked *